Week 7, Block P2
Hi We have worked out the perimeter of our house,
The perimeter of our house is 120 square meters
The volume of our house is ..
The highest point of our house is 7 square meter that's 14 blocks
The middle point of our house is 4 square meters that's 8 blocks
And the lowest point of our house is 3.5 square meters that's 7 blocks
And the lowest point of our house is 3.5 square meters that's 7 blocks
We calculated the perimeter of the small room
the perimeter is 38 square meters
The area is 20 square meters
the volume is 1600 square meters volume.
Week 6, Block P2
Me and Kallista have been busy creating our house today is the last day for our block house we are almost done. Since I wrote last we have created..
A chimney,
We created a chimney cause we thought our house could be really cold.
Garden, This is our garden we made two gardens one with seeds the other with melons I love it.
Our pool, This is our diamond pool, We have a water slide running into the pool with a water fall its awesome.
Disco floor, We decided to make a disco floor but above on the roof, we have a different coloured roof above the Living room and spare room/ study.
Spa pool,
This is our final snapshots we have finish and will give one next blog of our were about hope you love our house.
Week 3, Block P2
So me and Kallista are renovating again I am going to finish the teens room and get on to another started. The theme for the teens room is black and white. The theme for the Kids room is pink and purple. The theme for the main bedroom is red and blue and well the rest is Kallista's
Thanks for reading see you tomorrow.
Week 3, Block P2
Well Kallista and I have found out we will not be renovating on our room today but I can give you a little heads up on what's going on in the Mine craft world.
While you've been gone we have split into two, my jobs are the bedrooms and bathrooms, so I will be creating the Main bathroom, En suite, Main bedroom, Teens room and the entrance way.
Kallista will be creating thee greenery and living spaces. so she will be creating the back yard, living room, family room, kitchen and dining. So we both have a lot to do as you can see and we don't have a lot of time to spare but we are finding great ways to contribute our blocker life onto the blog so you can see what we are doing.
You can keep in touch with us over comments, ask us questions on how to do thing, advise if you want to start a blocker and if you have some ideas we would appreciate it.
Thanks for reading see,
Next post tomorrow.
Week 2, Block P2
Kallista and I are busy designing our plans and house, we now have a new project to make the whole house inside and out from with-in 3 weeks.We are building a two story house each seven blocks high.We have been busy creating the sketch designs here are a peek. This is the design for our:
. Teen room
In the middle of our room we have a feature floor, we have a double bed with two side tables with saplings on them. A book shelve running down the whole wall. we have a computer table with a laptop on it, two draws and a chairs.
. Outdoor perspective
Starting from the bottom we have a garage on the right hand side, There is a off part coming from the house with the main bathroom in it. When you walk in the first thing you'll see is the family room and as you turn right you will see the kitchen and dining area. making your way back is the teens room and kids room. and then there are stair going to the second story.
.Look-out platform:
On our little look-out platform we have a couch running around the whole square we have a table in the middle and a glass look-out.
. Back yard:
In our back yard we have a dimond pool, a deck coming from the house, a playground coming off the stairs and a vege patch
Thxs for watching
.
Wow! What an impressive house. Can you add some screen shots to your updates so we can see what it looks like?
ReplyDeleteI love the way you have explained your themes for each room Ryleigh.
ReplyDelete